Main Article Content

Abstract

Product development time estimation is important for project management tasks. This study investigates the impact of requirements reuse on product development duration for different products in a similar domain. We propose an analytical tool to estimate the minimum time to be saved given the percentage of requirements reused from earlier projects. This paper presents basis for the formal reuse of hardware components as a strategy to reduce the task for verifying new hardware elements. Assuming the existence of a library of formally verified hardware components, we propose to make effective reuse of these existing elements when creating new ones. The concept of software component reuse is simple: the idea of building and using "software preferred parts." By building systems out of carefully designed, pre-tested components, one will save the cost of designing, writing and testing new code. The practice of reuse has not proven to be this simple however, and there are many misconceptions about how to implement and gain benefit from software reuse. One case from organization has been studied for software and system development projects, which consist of hardware and software components. The results of the case studies are compared with a study in the literature on product development time.

Keywords

Hardware reuse Software reuse Griffin formula Time development Recycle.

Article Details

How to Cite
Mistry, B. P. (2015). IMPROVING DEVELOPMENT TIMES BY REUSING FLEXIBLE HARDWARE AND SOFTWARE COMPONENT. International Journal of Students’ Research in Technology & Management, 1(6), 619–623. Retrieved from https://mgesjournals.com/ijsrtm/article/view/106

References

  1. Matthew R. Kennedy and David A. Umphress, “An Agile Systems Engineering Process - The Missing Linkâ€, CrossTalk, The Journal of Defense Software Engineeringâ€, May-June 2011.
  2. Richard Turner, “Toward Agile Systems Engineering Processesâ€, Cross Talk, The Journal of Defense Software Engineering, April 2007.
  3. Shaojie Guo, Weiqin Tong, Juan Zhang, and Zongheng Li, “An Appli- cation of Ontology to Test Case Reuseâ€, International Conference on Mechatronic Science, Electric Engineering and Computer, pp. 775-778, 2011.
  4. Martin L. Griss, John Favaro, and Paul Walton. Managerial and Organizational Issues - Starting and Running a Software Reuse Program, chapter 3, pages 51-78. Ellis Horwood, Chichester, GB, 1993.
  5. Abbie Griffin, “The Effect of Project and Process Characteristics on Product Development Cycle Timeâ€, Journal of Marketing Research, Vol. 34, No. 1, pp. 24-35, February 1997.
  6. Timo Kkl, “Standards Initiatives for Software Product Line Engineering and Management within the International Organization for Standard- izationâ€, Proceedings of the 43rd Hawaii International Conference on System Sciences, pp. 1-10, 2010.
  7. Sholom Cohen, “Guidelines for Developing a Product Line Concept of Operationsâ€, Technical Report. CMU/SEI-99-TR-008, August 1999.
  8. Frank Dordowsky, Richard Bridges, and Holger Tschpe, “Implementing a Software Product Line for a complex Avionics Systemâ€, 15th Inter- national Software Product Line Conference, pp. 241-250, 2011.
  9. Kentaro Yoshimura, Jun Shimabukuro, Takatoshi Ohara, Chikashi Okamoto, Yoshitaka Atarashi, Shinobu Koizumi, Shigeru Watanabe, and Kazumi Funakoshi, “Key Activities for Introducing Software Product Lines into Multiple Divisions: Experience at Hitachiâ€, 15th International Software Product Line Conference, pp. 261-266, 2011.
  10. Andy J. Nolan, Silvia Abraho, Paul C. Clements, and Andy Pickard, “Requirements Uncertainty in a Software Product Lineâ€, 15th Interna- tional Software Product Line Conference, pp. 223-231, 2011.
  11. Eric M. Olson, Orville C. Walker, Robert W. Ruekert, and Joseph M. Bonner, “Patterns of Cooperation During New Product Development Among Marketing, Operations and R&D: Implications for Project Per- formanceâ€, Journal of Product Innovation Management, Vol 18, Issue 4. pp. 258-271, July 2001.
  12. Abbie Griffin, “Metrics for Measuring Product Development Cycle Timeâ€, Journal of Product Innovation Management, Vol. 10, No. 2, pp. 112-125, March 1993.
  13. Abbie Griffin, “The Effect of Project and Process Characteristics on Product Development Cycle Timeâ€, Journal of Marketing Research, Vol. 34, No. 1, pp. 24-35, February 1997.
  14. He-Biao Yang, Zhi-Hong Liu, and Zheng-Hua Ma, “An Algorithm for Evaluating Impact of Requirement Changeâ€, Journal of Information and Computing Science, Vol. 2, No. 1, 2007.
  15. Susan Ferreira, James Collofello, Dan Shunk, and Gerald Mackulak, “Understanding the Effects of Requirements Volatility in Software Engineering by Using Analytical Modeling and Software Process Simulationâ€, Journal of Systems and Software, Vol. 82, Issue 10, pp. 1568- 1577, October 2009