Main Article Content

Abstract

Purpose: Engineering, procurement, and construction (EPC) contracts are on their way to becoming the most common type of contract used by the private sector for large-scale infrastructure projects. Every project requires a strong relationship between all of the experts participating in EPC projects and the client. This relationship must be solidly established by an architect; otherwise, the project may fail for all parties involved, including the client, contractor, lenders, government, and others. The purpose of this study is to identify if the working of the EPC contracts is favourable for the architectural profession, and to identify the way in which the working could be improved.


Methodology: A qualitative approach was applied to analyze the critical points of EPC contracts based upon reviews of related case studies from the public sector and supplementary interviews with professionals in the field.


Main Finding: The architect's role in an EPC contract is not crucial and is equal to other stakeholders involved in the project. Also, EPC contractors have the power to dictate the workflow of the project and hence, architects might have to compromise in terms of the design, compensation, etc.


Implications: It is very important for every project to have an outcome based on each stakeholders/consultants inputs specially on larger projects, this article is a step towards understanding the role of architects under an EPC contract as the future projects will come under its purview. 


Novelty: The study is done under the lens of a newly graduated architect and not as any other professional, thereby trying to develop an understanding for fresh architects.

Keywords

EPC Contractor Architect Tenders Workflow Construction Management

Article Details

How to Cite
Dasyapu, A., Nagubilli, G., Kutcharlapati, J. V., Guntuku, H. P., & Nagdeve, S. S. (2021). Role of an architect in projects involving EPC contracts. International Journal of Students’ Research in Technology & Management, 9(4), 01–15. https://doi.org/10.18510/ijsrtm.2021.941

References

  1. Design, E. P. C. A., & Bus, I. S. (n.d.). VOLUME 2-EPC AGREEMENT Design , Engineering , Procurement & Construction of Inter State Bus Terminal Cum Multilevel Car Parking Cum Commercial Complex at Katra on Turnkey Basis ( the “ Project â€) Table of Contents. 2.
  2. Loots, P., & Henchie, N. (2007). Worlds Apart: EPC and EPCM Contracts: Risk issues and allocation. International Construction Law Review, 24(1/4), 252.
  3. Station, R., With, A., Development, T. H. E., & Gandhinagar, S. A. T. (n.d.). EPC Agreement.
  4. NITI Aayog Government of India (2017), CIDC-Model-EPC-Agreement-22032018. http://niti.gov.in/writereaddata/files/new_initiatives/CIDC-Model-EPC-Agreement-22032018.pdf
  5. Toppicks,(n.d) Retrieved February 20, 2020, from https://toppicks.co.in/top-epc-companies-in-india/
  6. Suhaina Darlina Follow Pegawai Pendidikan Pengajian Tinggi DH41 at Kementerian Pengajian Tinggi Malaysia - https://www.slideshare.net/suhainadarlina/chapter2-slides-45346721
  7. Chapter 2 Foodservice Design https://www.scribd.com/presentation/394902781/Chapter-2-Foodservice-Design
  8. Dr K M SONI Follow Chief Engineer - https://www.slideshare.net/DrKMSONI/epc-and-other-types-of-contracts
  9. CMA Krishnan - https://www.caclubindia.com/articles/basic-understanding-of-an-epc-contract-17604.asp
  10. What Is the Difference Between Epc and Turnkey Contract? https://www.answers.com/Q/What_is_the_d ifference_be tween_EPC_and_turnkey_contract
  11. Leonardo Energy (2020). Retrieved February 20, 2020, from https://help.leonardo-energy.org/hc/en us/articles/202947081-Which-are-the-steps-to-follow-for-developing-an- EPC-contract-